Scenes from the construction

2015 - UK - hythe


Carbon moment
Applying laminate
Everything is carefully weighed

Everything starts with an idea born in 2015 at the Malcolm McKeon Yacht Design studio (MMYD). The long process started at Green Marine Shipyard, Hythe, UK, including a proof of the model in the water.

First half being infused
Applying laminate to topside tooling
Hull bottom outer skin
A taste of the model in the water
The heart-stopping moment of the turning of the boat

2016 - Holland - ZWARTSLUIS


Electrical cables will soon be ordered

The boat arrives in Holland waters. Another year of hard work starts.

Unveiled in white, ready to be transported to Holland
The curve of an unsusual stern
The interiors come together
Work is on all fronts

2017 - towards the happy moment of the launch


The boat leaves the shipyard, destination Zandaam to touch the water for the first time.

The boat leaves Vitters Shipyard and goes to Zaandam

With champagne christening Ribelle is born!!

Touching water for the first time